ChipsThe story, in brief

Meta Plans 7,000-Kilometer Subsea Cable Between US and France

Meta's building infrastructure, not models. A 7,000km subsea cable between US and France signals where the real AI bottleneck lives: moving data, not making it.

Paper-cut illustration of an amber microchip with circuit paths extending into a row of data-center cabinets.
The infrastructure powering AI.AI illustration by KeyNews
The KeyNews take

Why it matters

Meta is investing in the physical layer of AI — submarine cables and data-center connectivity — to handle the compute and model-serving demands of its agentic and multimodal roadmap. This is part of the broader buildout story: the infrastructure race is as critical as the silicon race.

The key facts

8 to know
  1. Meta Petal subsea cable: US-France, 7,000 km

  2. Capacity: 1 Pbps (petabits per second)

  3. Two-core fiber design

  4. Signals Meta's data-center and AI serving infrastructure expansion

  5. Meta Petal subsea cable: 7,000 km US-France route

  6. 1 Pbps capacity via two-core fiber

  7. Part of rising data demand for AI workloads

  8. Transatlantic connectivity infrastructure

Go to the source

TechRepublictechrepublic.com

Publisher excerpt: Meta’s planned Petal subsea cable will connect the U.S. and France with 1 Pbps of capacity, using two-core fiber to meet rising data demand.
Read original report
Back to today's editionMore chips news

Keep reading

Related stories

More from Chips