Meta Plans 7,000-Kilometer Subsea Cable Between US and France
Meta's building infrastructure, not models. A 7,000km subsea cable between US and France signals where the real AI bottleneck lives: moving data, not making it.

Why it matters
Meta is investing in the physical layer of AI — submarine cables and data-center connectivity — to handle the compute and model-serving demands of its agentic and multimodal roadmap. This is part of the broader buildout story: the infrastructure race is as critical as the silicon race.
The key facts
8 to knowMeta Petal subsea cable: US-France, 7,000 km
Capacity: 1 Pbps (petabits per second)
Two-core fiber design
Signals Meta's data-center and AI serving infrastructure expansion
Meta Petal subsea cable: 7,000 km US-France route
1 Pbps capacity via two-core fiber
Part of rising data demand for AI workloads
Transatlantic connectivity infrastructure
Go to the source
TechRepublictechrepublic.com
Publisher excerpt: Meta’s planned Petal subsea cable will connect the U.S. and France with 1 Pbps of capacity, using two-core fiber to meet rising data demand.